LA Shower Pans
  • HOME
  • SITE PREP
  • CONTACT

PREPARATION GUIDE


Showers

- Use a NEW two or three piece bolt-together drain with the outer edges of the sub-drain flange installed flush or resting on top of slab/subfloor

- Set water thresh-hold also known as the entry dam/curb at a height above the drain top strainer. Three stacked 2x4"s is common. Damless showers MUST have recessed subfloor.

- The wall base around the shower needs to have a minimum of 10 inches high of solid blocking in between the studs. 2x10"s are common.

- Benches need to be solid on all faces to be hot mopped. In addition, benches need to have a minimum of 4" inches of backing around them; this includes the top and side walls. Please call for details about preparing floating benches.

- Sub floor must be level and solid with no gaps or holes.

 


Questions? Call Us 1-888-811-2322


Decks and Balconies


- Make sure subfloor is solid (no holes or gaps) and slopped to the sub drain flange or gutter.


- Completely remove any old waterproof membranes and make sure deck is dry and clean.


- Deck needs to be PROPERLY flashed using 4” inch “L” shaped metal flashing on all walls, steps, and transitions. This flashing needs to go behind stucco siding.


* We do not do flashing. You must consult your local code requirements and/or a general contractor to make sure this is done correctly.


CALL US TODAY! 1-888-811-2322

© Copyright 2012, Magma Shower Pans -- Hot Mopping Shower Stalls, Decks, Etc